Logistics · Supply chain

Liviu Ojogel

Warehouse layouts, material flow, and the run that leaves the yard.

Drawings

A sample warehouse for line supply.

Raw material in storage, a supermarket fed by kanban, and a milk-run to the line. Click a zone.

Line supplyWarehouse layoutWH-011:400L. OjogelLogisticsRECEIVINGKANBANDISPATCHSUPERMARKETSTORAGEPICKING / PACKINGKANBANEXPEDITIONMILK-RUN

Stop 2

Storage

Raw material in the warehouse location. The line does not pick from these aisles.

Routes

Can one driver finish Switzerland today?

The truck leaves Basel and has to come back. Click a city to add it. Nine hours is the driving limit. Each drop takes 20 minutes to unload, and that time is not driving.

Fits today

Driving stays inside 9 hours, with 1 h of unloading on top. One truck can finish and return.

Driving
5 h 55 min
Unload
1 h
Distance
385 km
  1. Start Basel
  2. 1Zürich
  3. 2Bern
  4. 3Lausanne
  5. Back Basel

Estimated at 65 km/h until the road time loads. Add Lugano if you want to see the day break.

Loading the map

Systems

SAP for the logistics modules. Python for the check.

SAP

Logistics modules

Purchasing, the warehouse, the order, the freight, and the supply to the line.

  • MM

    Materials Management

    Purchasing, goods receipt, and the invoice that matches them.

  • WM

    Warehouse Management

    Bins, transfer orders, and the move from door to location.

  • SD

    Sales and Distribution

    The order, the delivery, and what is allowed to ship.

  • TM

    Transportation Management

    Freight units, planning, and settlement.

  • PP

    Production Planning

    MRP and the supply that actually reaches the line.

Python

The same questions in Python

A file, a lane, or a stock figure, checked before it becomes a process.

  • pandas

    Data

    Order lines, stock, and the file the warehouse actually exports.

  • scripts

    Automation

    A check that runs the same way every morning, not a new spreadsheet.

  • routing

    Distance

    Drive time and kilometres before a lane is booked.

  • files

    Extracts

    Excel and CSV, cleaned before anyone argues about the number.

  • plots

    A picture

    A flow or a load someone can see, not only a table.

Flow

Inbound to last mile

Control

Inventory you can trust

Cost

Service without waste

Calm

Exceptions handled early

About

A specialist for the part of the business customers never see.

Supply chains fail in the gaps: a late booking, a count that does not match the system, a carrier who was never the right mode. I work those gaps — between planning, the warehouse floor, and the road.

The job is not more process for its own sake. It is a network simple enough to run on a normal Tuesday, and clear enough to recover when Tuesday is not normal.

Open to logistics and supply chain roles, and to project work where a flow needs to be redesigned rather than patched.

Planning desk with a route map and a small pallet

Practice

Where the work sits.

01

Network & transport

Lane design, mode choice, and a booking rhythm that keeps capacity without paying for empty miles.

Plan a Swiss run
02

Warehouse flow

Receiving, slotting, pick paths, and dispatch planned around the order profile, not the other way around.

Follow the flow
03

Inventory & planning

What to hold, where, and when to replenish. Safety stock that covers real variability, not a round number.

04

Order promise

Cut-off times and the link between what sales offers and what operations can actually ship.

05

Exceptions

Shortages, delays, claims, and peak. A short escalation path, and a record of what broke.

06

Partners

3PLs, carriers, and suppliers managed on facts: lead time, damage, on-time, and cost per unit moved.

Containers beside a highway interchange at dusk

Approach

Measure the flow, then change one thing.

  1. 01

    See the real path

    Walk the order from demand to delivery. Map where time and cost actually sit.

  2. 02

    Name the constraint

    One bottleneck, one unreliable handoff, or one number nobody trusts.

  3. 03

    Set a service line

    Agree what on time means, for whom, and what it is allowed to cost.

  4. 04

    Run it, then tighten

    Change the process, watch a full cycle, keep what holds on a busy day.

Focus

Problems I take on.

These are the kinds of problems I work. Swap in named engagements when you are ready to publish them.

Outbound

A cut-off the warehouse can keep

Align order promise, pick waves, and carrier collection so the last hour is planned, not improvised.

Service you can publish

Inventory

Stock that matches the order book

Reconcile system and floor, then set replenishment around real lead time and demand swing.

Fewer false shortages

Network

The right mode on the right lane

Separate urgent freight from planned freight, and stop paying express rates for orders that were never urgent.

Cost with a reason

Contact

If a flow is late, noisy, or expensive, write.

Logistics specialist and supply chain specialist. Available for permanent roles and defined projects.